Guangzhou Metro Route 14 - Phase 1, Guangdong, China (Contract Nos 6 & 7)



Project Background

Project Client:Guangzhou Metro Corporation
Contractor: The Third Engineering Group Co., Ltd. of China Railway
Period:2013 – 2015


Services provided by YWL


YWL Engineering was engaged by the Contractor to provide the construction engineering services as follows:

  1. Segment mould design
  2. Geometry control for short line match-casting segments
  3. Precamber calculation
  4. Launching girder review