Shanghai – Chongming Bridge (Contract B6), China
 



Project Background

Project Client:Commanding Post of Shanghai Tunnel & Bridge Construction
Contractor: Shanghai Foundation Engineering Co.
Period: June 2006 – December 2008
Construction Cost:RMB 400M (USD 52M)


Services provided by YWL


YWL Engineering was engaged by the Contractor to provide the construction engineering services as follows:

  1. Segment mould detailed design
  2. Geometry control for short line match-casting segments
  3. Geometry control during erection
  4. Precamber calculation
  5. Permanent works check during construction stage