Sutong Bridge (Contracts B2 & D1), Jiangsu, China

 



Project Background

Sutong Bridge is part of a traffic trunk connecting cities Nantong and Suzhou (Changshu) across the Yangtze River in the south of Jiangsu Province. The central crossing consists of a total length of 8.2km bridge structures with 6-lane dual carriageway. The precast segmental approach structure of the Sutong Bridge with 75m span length was constructed using balanced cantilever method. This precast segmental viaduct was characterized by deep foundation in the riverbed, 60m high columns connecting the main bridge and relatively long end spans in the balanced cantilever deck.


Project Client:Jiangsu Provincial Sutong Bridge Construction Commanding Department
Contractor:The Second Navigational Engineering Bureau, China Harbour Engineering Co (Group)
Period:May 2004 - October 2006
Construction Cost:RMB 500M (USD 62M)


Services provided by YWL


YWL Engineering was engaged by the Contractor to provide the construction engineering services as follows:

  1. Value engineering of precast segmental viaduct structure
  2. Segment mould design
  3. Geometry control for short line match-casting segments
  4. Geometry control during erection
  5. Precast yard layout planning
  6. Erection engineering
  7. Launching girder design