|
|||||||
|
|
Project Client: | Highways Department, Hong Kong |
Contractor: | Gammon Construction |
Period: | 1998 - 2000 |
YWL Engineering (in association with Lambeth) provided the alternative design of the permanent structure which consisted mainly of three precast segmental bridges and a number of earth retaining structures; the construction engineering services associated with segment casting and erection e.g. shop drawings, design for girder-deck interaction and construction methods.