TsingYi North Coastal Road, Hong Kong

 



Project Background

Project Client:Highways Department, Hong Kong
Contractor:Gammon Construction
Period:1998 - 2000


Services provided by YWL


YWL Engineering (in association with Lambeth) provided the alternative design of the permanent structure which consisted mainly of three precast segmental bridges and a number of earth retaining structures; the construction engineering services associated with segment casting and erection e.g. shop drawings, design for girder-deck interaction and construction methods.